Why Now Is the Best Time to Lock in a Construction Contract Before Costs Rise Further

Why Now Is the Best Time to Lock in a Construction Contract Before Costs Rise Further

Trying to time the construction market is a bit like waiting for the perfect weather to pour concrete: the forecast shifts, the clock keeps ticking, and the cost of delay is rarely obvious until it lands on your desk. After several years of material volatility, tight labor markets, and shifting lead times, many owners and developers are weighing a familiar question with renewed urgency: is now the moment to lock in a contract before costs climb again?

Price certainty has become a form of value in its own right. Even as some inputs stabilize, contractors and suppliers continue to adjust pricing with short hold periods, and busy pipelines can turn available crews into long waits overnight. The result is a narrow window in which you can still secure scope, schedule, and key materials at known numbers-without betting on an elusive market dip that may never arrive.

This article explores why that window matters: the structural drivers behind recent cost pressure, what locking in actually protects, and the contractual tools that preserve flexibility if conditions change. It also outlines when waiting can make sense and how to avoid overcommitting. The goal isn’t to hurry you to groundbreaking, but to show how a timely commitment-structured wisely-can reduce risk, defend budgets, and keep your project moving.

Navigating today’s construction market means grappling with a web of quantifiable cost drivers-each shaping your project’s bottom line. Material prices have become volatile, from steel and copper to lumber and drywall. Labor, too, remains scarce in many regions, with wages climbing as skilled trades are spread thin. The ability to track these variables-material indices, labor rates, shipping surcharges-enables more precise forecasting but also reveals how rapidly your project expenses can grow. Consider this snapshot of typical cost trends:

Cost Driver 2023 Trend 2024 Q1 Status
Steel +12% Stable, slight uptick
Skilled Labor +8% Ongoing shortage
Cement +10% Rising
  • Financing leverage: Locking rates early protects your budget as lending terms tighten.
  • Bulk procurement: Aggregating orders or securing bonded PO’s can fix pricing before suppliers reprice on new quotes.
  • Custom contract clauses: Use escalation indices to cap exposure, structure shared savings, and clarify transparent allowances-turning volatile elements into manageable, trackable project elements.

Early action is more than hedging-it’s about harnessing tactical procurement methods to blunt input shocks and secure supplier loyalty. Now is the moment to negotiate those key provisions into your contracts, leveraging today’s rates and labor condition realities. Strategic teams are integrating bulk buys and long-term supplier agreements with clear escalation clauses and shared savings frameworks, ensuring transparency and adaptability as markets move. Taking these steps delivers the groundwork for cost certainty, even as the industry’s core drivers keep evolving.

Q&A

Q: Why are people saying now is the best time to lock in a construction contract?
A: Because several cost drivers-labor, materials, logistics, and regulatory changes-tend to ratchet upward over time, and contracts can freeze a significant portion of your price. By committing early, you secure contractor capacity, lock in key supplier quotes, and reduce exposure to future inflation or supply disruptions. Waiting may yield marginal savings if demand cools, but it also risks higher prices, longer lead times, and reduced subcontractor availability.

Q: Aren’t material prices stabilizing?
A: Some have stabilized relative to pandemic-era spikes, but volatility remains. Steel, copper, electrical gear, and concrete are sensitive to energy prices and global events. Lead times on items like transformers, switchgear, elevators, and custom glazing can lengthen with little notice. Stability today does not guarantee stability tomorrow.

Q: What specifically is pushing construction costs higher?
A:
– Skilled labor shortages and scheduled wage escalations
– Energy prices affecting manufacturing and transport
– Persistent demand in certain sectors (infrastructure, data centers, healthcare)
– Code changes and sustainability requirements increasing specifications
– Geopolitical disruptions to shipping routes and raw materials
– Financing and insurance costs baked into contractor and supplier pricing

Q: How does signing now actually protect my budget?
A: Locking in a contract lets the builder secure time-limited supplier quotes and reserve subcontractors. If done properly, you can fix unit prices for major scopes and material packages, cap overhead and fee, and convert price uncertainty into defined allowances or escalation formulas. It turns an open-ended risk into a planned number.

Q: What if prices drop after I lock in?
A: You can negotiate shared-savings provisions, market-reopener clauses for specific commodities, or unit-price schedules that float down if the market softens. An open-book GMP (Guaranteed Maximum Price) with transparent buyout can allow you to benefit from favorable bids.

Q: Which contract type best balances certainty and flexibility?
A:
– Fixed-price (lump sum): Maximum price certainty if design is well-defined; less flexible to changes.
– GMP (open-book): Caps your cost while sharing visibility into bids; good for evolving designs.
– Cost-plus with a cap: Flexible but requires trust and oversight; use for complex or fast-track projects.
Include an escalation clause only where truly unavoidable (e.g., named commodities) and define clear triggers.

Q: What should an effective price-lock clause include?
A:
– A detailed scope and drawings list the price is based on
– A schedule defining how long prices are held and by whom (GC and key subs)
– A list of early-procured, price-fixed materials with quote validity periods
– Named commodities with escalation formulas and caps (if any)
– Allowance amounts with unit rates for over/under adjustments
– A crisp change-order process and timelines

Q: Can I lock in costs even if my design isn’t finished?
A: Yes. Use preconstruction services to refine scope and pricing. Release early packages (civil, foundations, steel, MEP equipment) while the rest of the design advances. Letters of intent can secure shop slots. Just pair this with a clear phasing plan and interface definitions to avoid scope gaps.

Q: How do I avoid paying a premium for speed?
A:
– Run competitive bids for major trades even in a fast-track plan
– Use alternates and approved equals to keep pressure on pricing
– Freeze design milestones to limit churn
– Bundle long-lead buys early, not everything
– Keep contingencies proportionate and transparent

Q: What about interest rates-could waiting help?
A: If financing costs fall meaningfully, your total project cost could improve even if construction inputs rise. But rate timing is uncertain. Many owners hedge by locking construction costs now and retaining flexibility to refinance long-term debt later, or by structuring draw schedules to match cash flow.

Q: Are there regulatory or code changes I should consider?
A: New energy codes, embodied carbon limits, and life-safety updates can add cost and complexity. Permitting under current codes (where allowed) can preserve today’s requirements. Confirm local adoption calendars; sometimes a few months decides which code set applies.

Q: What long-lead items should be prioritized for early procurement?
A: Electrical switchgear and transformers, air-handling units and chillers, elevators, specialty glazing and curtainwall, generators, lab/medical equipment, and certain finishes. Early release reduces schedule risk that can otherwise translate into cost escalations and liquidated damages exposure.

Q: How big a role does labor play right now?
A: A major one. Many markets face tight skilled labor supply, and union and prevailing wage agreements often include escalations. Securing a contractor’s team and key subs early can prevent later wage-driven premiums or crew shortages.

Q: What happens if supply chains improve after I sign?
A: You can capture benefits via:
– Market re-bids at buyout with shared-savings language
– Substitution clauses allowing approved equal products with better availability
– Return of unused contingency and allowances at project closeout

Q: I’m worried about escalation surprises. What guardrails can I add?
A:
– Cap exposure with a GMP and specific commodity riders with ceilings
– Define escalation windows and cut-off dates per package
– Require time-stamped backup for any claimed escalation
– Use indexed adjustments (e.g., tied to a recognized producer price index) for named items only

Q: What if I’m not ready to start construction on site?
A: Consider an early procurement agreement for long-lead materials, off-site fabrication slots, and shop drawings. Storage and insurance terms should be explicit. This approach “banks” critical cost and schedule elements without mobilizing the whole job.

Q: How do I compare contractor proposals fairly?
A: Normalize them. Ask each bidder to:
– Use the same alternates, allowances, and unit prices
– Break out general conditions, fee, contingency, and insurance
– Provide a buyout plan and key supplier quote hold dates
– Disclose assumed productivity rates and crew sizes
– Share a preliminary risk register and float in the schedule

Q: Is there a risk to locking in too fast?
A: Yes. Rushing without a solid scope can push costs up via change orders. Balance speed with clarity: freeze enough design to price confidently, keep reasonable contingencies, and phase only where interfaces are well-defined.

Q: What contingencies should I carry?
A: Typical owner contingencies range from 5-10% depending on design maturity and complexity. Contractor contingency inside a GMP might be 2-5%. Reduce as design advances. Keep separate allowances for volatile items and unit-price lists for predictable quantities.

Q: How do sustainability goals affect the timing decision?
A: Low-carbon materials and high-efficiency systems can have longer lead times and evolving supply. Early engagement allows you to secure EPD-backed materials, heat-pump technologies, and tax incentive documentation before demand spikes further.

Q: What does a practical “lock it in” plan look like?
A:
– Weeks 0-2: Define must-have scope, set budget targets, choose contract model (preferably GMP/open-book for flexibility).
– Weeks 2-6: Run competitive preconstruction services; align on schedule; identify long-leads; draft escalation and savings-sharing language.
– Weeks 6-10: Issue early packages; secure supplier quotes with hold periods; finalize GMP with clear allowances/units.
– Ongoing: Monthly risk reviews; track buyout savings; execute substitutions to improve price/lead time.

Q: Bottom line-should I lock in now?
A: If your scope is reasonably defined and you can secure a capable contractor with transparent, guardrailed terms, locking in now reduces meaningful risk of future cost increases and schedule slippage. If your project is highly fluid or your market is clearly cooling, a short, disciplined preconstruction period to sharpen scope and competitively test pricing may yield better value-then lock promptly.

Q: Any final cautions?
A: Construction markets are local. Validate with current supplier quotes, labor availability, and permitting timelines in your region. Build in transparency, caps where you can, and mechanisms to share both risk and upside. That way, “locking in” becomes a strategy, not a gamble.

To Conclude

In a market where materials, labor, and borrowing costs rarely sit still, certainty becomes a kind of currency. Locking in a construction contract now won’t stop the wider economy from shifting, but it can give your project a fixed point to build around-clearer pricing, firmer timelines, and fewer surprises as conditions evolve.

This isn’t about moving fast for its own sake. It’s about moving deliberately: defining scope with precision, vetting escalation language, aligning schedules with realistic lead times, and stress-testing budgets with contingencies. The goal is balance-protecting against upward cost drift without taking on commitments your team and cash flow can’t comfortably support.

If the plan pencils out today, consider turning intent into ink while rates, bids, and availability still line up. Coordinate with your builder, lender, and counsel; compare fixed-price and GMP options; and document what happens if markets swing. Do that, and you transform a volatile forecast into something far more workable: a project grounded in clarity, built to withstand the weather.

LEAVE A REPLYYour email address will not be published. Required fields are marked *Your Name

21a Welbeck Road Maidenhead, Sl6 4EB
Mon - Sat: 8:30-5:30
079-0109-8662
support@lucyandphilltd.co.uk
Copyright © 2025 Lucy and Phil LTD. All Rights Reserved.