Practical completion is not handover.
Fine construction dust is patient. It settles on glazing and frames, drifts into trunking and HVAC, powders down onto sanitaryware and skirtings long after the last trade has left site. At practical completion a build looks done. It isn't. The gap between 98% and ready-to-photograph, ready-to-let, ready-to-occupy is the one thing no site diary ever captures — and the one thing a specialist after-builders clean exists to close. We own that last mile between sign-off and handover, so the space you present is the space you promised.
An after-builders clean is a process, not a once-over. Here's how we measure "done."
Rough clean, detail clean, then final sparkle and handover inspection — each stage gated before the next begins.
At handover. Nothing is marked complete until the inspection checklist is signed clean.
England, Scotland, Wales and Northern Ireland — availability confirmed by location, scope and route.
Drawn from our Prepare & Present catalogue — scoped to the building, not to a template.
The core discipline — stripping a freshly completed build of every trace of the work that made it, from first-fix dust to final sparkle.
Intensive, surface-by-surface attention where ordinary cleaning stops short.
Lobbies, stairwells and shared spaces returned to a let-ready finish.
Offices, retail and workplaces prepared for occupation or fit-out handover.
Non-standard builds and sensitive environments, scoped case-by-case.
Where the last 2% lives — the visible delta between sign-off and handover.
Three-stage sign-off — no job marked complete until the final inspection is signed.
If you own the last mile to practical completion, this service is built for you.
They walked our three-storey fit-out from first fix dust to a photo-ready handover — the final inspection was signed off clean, first time.
Tell us the site, the scope and the completion date — we'll send a cleaning proposal.
Service availability is confirmed by project location, scope and route.